EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
cbecker
-
Listing for Category : flaps
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (163)
Avionics
- (1)
Controls
- (4)
Empennage
- (1)
Engine
Firewall
Fuel System
Fuselage
- (83)
-
Fabricated step
-
Brake pedal...
-
Upper baggage...
-
Upper Baggage Shelf
-
Rear shoulder...
-
Finish welded front...
-
Fabricated fairlead...
-
Rear fuselage tabs...
-
Nut plates
-
Floorboard tabs for...
-
Shoulder harness...
-
Shoulder harness...
-
Cut and fit...
-
Seat belt bushings
-
Extended baggage...
-
Installed floorboard...
-
Extended baggage...
-
Shoulder harness...
-
Front Seat Belt
-
Fabricated and tack...
-
Removable Cross...
-
Brake pedal support...
-
Upper Baggage Door...
-
Lower baggage door
-
Lower Baggage Door
-
Rear Rudder Pedals
-
Rudder Pedal Brackets
-
Turtle deck and Rear...
-
Turtle Deck Install
-
Fabricated More...
-
Turtle deck attachments
-
Welding Clean Up
-
Seat belt attachment
-
Left Upper Door
-
Hinges for upper door
-
Hinges for upper door
-
Upper Door Frame...
-
Upper Door Frame...
-
Upper Door Frame
-
Upper Door Frame
-
Starting on Upper Doors
-
Upper Door Frame...
-
Door frame
-
Stirrup
-
Reinforced rear...
-
Attached Rudder
-
Welding Rudder Tabs
-
Extended Baggage
-
Tail Wires
-
Tail wire attachment
-
Pulley Alignment
-
Trying on the...
-
Lower Door Construction
-
Forward Cockpit Tubing
-
Fuselage Tubing in...
-
Forward Tubing
-
Fixturing up the...
-
Trimming the Longerons
-
Cathedral Baggage
-
Auto Entry: Oct 26,2013
-
Piper Channel
-
Auto Entry: Oct 19,2011
-
Fuselage Tailpost
-
Fuselage Firewall
-
Top of Fuselage
-
Fuselage Frame Up
-
Fuselage Completely...
-
Fuselage Overview
-
Tail post
-
Auto Entry: Jul 10,2011
-
Fuselage
-
Reverse Dogleg
-
Rosette Weld
-
Fuselage Sides
-
Fuselage Side Tacked
-
Fuselage Side...
-
Fuselage Fabrication
-
Bending Longerons...
-
Fuselage Fabrication
-
Bending Longerons
-
Layout
-
Fuselage Layout
-
Laying Out Fuselage...
Inspection
Instrument Panel
Interior Finish
Landing Gear
- (4)
Lighting
Paint / Decals
Propeller
Research
- (4)
Tail Feathers
- (9)
Tools
- (7)
Wings
- (34)
Flaps
- (2)
Workshop
Auto Entry
- (14)
Builder Name:
Charlie Becker
-
Project:
Pirate Cub
-
VIEW REPORTS
Total Hours:
103.5
Start/Last Date:
Jan 30, 2011 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=cbecker
Home or Last Project Picture
Aug 11, 2020
Flap spar
- (1 hour)
Category: Flaps
15BE89B7-BDFE-4731-8C73-F5CC29AE13AD.jpeg
26207228-39F2-4AC9-B41B-E9BDE1C60F60.jpeg
83D7ECE5-CCEA-4E3D-B3B0-260E3435D908.jpeg
Aug 06, 2020
Auto Entry: Aug 6,2020
Category: Flaps
Cutting wood for jig board for putting washout into the ailerons and flaps
IMG_6010.jpg
IMG_6011.jpg
IMG_6012.jpg
IMG_6013.jpg
IMG_6014.jpg
IMG_6015.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.